Focus Article

Performing a Remote HAZOP

HAZOP studies are used during the design stages of a new process or project, for major process modifications, after start-up to identify what design assumptions could be replaced by operational evidence, and for periodic review of existing operations

The European Norm EN 61882, developed from IEC 61882, is the standard that underpins the technique. Most government regulators around the world recognise HAZOP as an acceptable methodology for evaluating risk. This paper looks at how leaders can perform HAZOP’s remotely.
Download our Focus Article to learn more.